Tightening Controllers

The controller is the brain of an electronic tightening system. It stores the programs, drives the tool motor, reads torque and angle, decides whether each tightening is OK or NG and communicates the result to the station and the plant systems. It can be a separate unit, connected to the tool by cable, or built into the tool itself, as in many battery models.

What does a controller do?

  • Tightening programs: stores the parameters for each joint (strategy, steps, speeds, targets and windows) and identifies them by number.
  • Motor control: regulates speed and stops the tool at the right moment.
  • Measurement or estimation: reads the transducer or estimates torque from current, and reads the angle encoder if there is one.
  • Evaluation: compares each result against its limits and gives OK or NG, with the reason for rejection.
  • Logging: stores results and, depending on the model, tightening curves.

Programs and jobs

In addition to the programs for each joint, many controllers let you define jobs: a sequence of tightenings for a complete part, with the number of fasteners, the program for each one and the order. The controller counts the tightenings, locks the tool when the part is complete and does not let the operator move on if a fastener is missing or there is a NG. See multi-step sequences.

Inputs, outputs and communication

  • Digital inputs and outputs: to enable the tool, select the program or turn on an OK/NG light.
  • Industrial fieldbuses: such as PROFINET, EtherNet/IP or Modbus TCP, to exchange data with the PLC.
  • Plant network: to send results to a server or the MES.
  • Accessories: barcode readers, socket selectors, stack lights and push-button boxes.

Which protocols and accessories each controller supports is confirmed model by model. See PLC / MES.

Access and change control

A change to a program changes the tightening of every part that follows. That is why the controller should have password-protected access levels, log who changed what and when, and keep a backup of the approved programs.

What to check on the data sheet

  • Which tools it drives and how many at once.
  • Available strategies and number of programs, steps and jobs.
  • How many results and curves it stores, and how they are exported.
  • Inputs and outputs, fieldbuses and network protocols.
  • Access levels and change logging.
  • Power supply, protection rating and mounting at the station.

Sources and references

  1. IEC 61131-2 — Programmable controllers — Part 2: Equipment requirements and tests
  2. VDI/VDE 2645 Blatt 2 — Machine capability test (MCT) for fastening technology

Technical review: Mauricio Ramirez, Senior Electric Torque Specialist

Related TMG products and services

← Back to Control and Traceability